Customer: GM-3, Appin North Colliery, Appin NSW
Project type: Electrical Installation and Commissioning
Control System: Rockwell Automation DC PowerFlex Drive
Touchstone Systems supported the upgrade of the Drift Winder DC drives at Appin North Colliery, working alongside Rockwell Automation to deliver the full electrical installation and commissioning scope. As safety-critical mine infrastructure, the works required careful planning, strict permit and isolation management, and close coordination with the GM-3 site team throughout.
Pre-works included a full review of Rockwell documentation, a site scoping visit, and creation of inspection test records for the new encoder cables ahead of installation.
Key deliverables included:
Works were executed by a team of Touchstone electricians and engineers over a compressed on-site programme, meeting all permit, isolation, and safety requirements. The upgraded Drift Winder DC system was successfully commissioned and handed over to GM-3 in full compliance with site requirements.